Detailed Project Reports
A Detailed Project Report (DPR) is a comprehensive document that provides an in-depth analysis of a proposed project. It serves as a blueprint for planning, implementation, and monitoring of the project, offering a detailed overview of various aspects.
DETAILED PROJECT REPORTS UNDERTAKEN BY THE COMPANY
FEW OF THEM ARE:
Project Name: Development Of Industrial Estate at Malwan Kulgam
Location: Malwan
Scope of Work: Preparation of Detailed Project Report including Surveying, Detailed Estimation, and Layout plan.
Client: SICOP.
Status: Completed
1. Project Name: Golf Course
Location: Leh, Ladakh
Scope of Work: Preparation of Detailed Project Report, including topographical surveying for the proposed golf club at Leh.
Client: Tourism (J&K)
Status: Completed
2. Project Name: Irrigation Canal Haba-Khatoon
Location: Dawer Gurez
Scope of Work: Preparation of Detailed Project Report, including topographical surveying for Irrigation Scheme Habakhatoon Canal.
Client: PW (R&B) Special Sub Division Gurez (J&K)
Status: On-going (Field Surveying works – Completed)
3. Project Name: Irrigation Canal Losserbeeb
Location: Kanzalwan Gurez
Scope of Work: Preparation of Detailed Project Report, including topographical surveying for Irrigation Scheme Losserbeeb.
Client: PW (R&B) Special Sub Division Gurez (J&K)
Status: On-going (Field Surveying works – Completed)
4. Project Name: Irrigation Canal Jornial Canal
Location: Puranatulail (PTL) Gurez
Scope of Work: Preparation of Detailed Project Report, including topographical surveying for Irrigation Scheme Losserbeeb.
Client: PW (R&B) Special Sub Division Gurez (J&K)
Status: On-going (Field Surveying works – Completed)
5. Project Name: Various Road under PMGSY-Package-III
Location: J&K India
Scope of Work: PreparationofDetailed Project Report, including topographical surveying, environmental assessment, Soil testing, Traffic volume count by ATC, Pavement Designs Complete for various roads of Kashmir Valley under PMGSY-Package-III for Irrigation Scheme Losserbeeb.
Client: Chief Engineer PMGSY Kashmir
Status: Completed
Length 350.00 Km